Showing posts with label FP Production. Show all posts
Showing posts with label FP Production. Show all posts

Monday, 31 January 2011

Transitions: 31st Feb

Today we continued to edit our film some more we added some transitions to our opening sequence and we added a film logo (wild wolf production) as well

Friday, 28 January 2011





We are currently still editing,trimming and cutting bits and pieces of our opening sequence because it was over the 2 minute limit, it means that we had to delete some of the scene we shot e.g the farther sence, however we have now managed to cut  down the film from 2.40 to 2.10 which is good as miss said she would accept the opening sequence to be 10 secounds over the limit.

Monday, 24 January 2011

Rough cut of our opening sequence






1.)  What has been your role in this lesson?
My role in this lesson was  opening sequence by up loading the remaining footage that we need in our opening sequence and by having a go at editing on the mac.

2.)  What skill have you developed?
By helping to do the rough cut of our opening sequence i'v learnt a lot of new skills on the mac and how to use it.

3.)  What have you changed about your opening sequence?
We had a lot of footage so we had to cut out some of the footage in order to make sure that our opening sequence isn't too long as our opening sequence is only meant to be 2 min.

4.)  What do you still need to do in the editing process?
Now that we have finished the rough cut of our opening sequence, we must now do our proper and finial editing. 

Tuesday, 18 January 2011

Filming: Latest update

We will be filming the car scene on friday after school and we are going to film the ponit of view shot at lunch time today

Monday, 17 January 2011

Fliming update for tomorrow

Tomorrow we will be filming the scene of he farther and the baby and the point of view shot in the interview room

i am currently waiting to see the day that we will be available for me to film the car scene

filming update

On Monday mantas was at an exam this meant that we were unable to film all the nessesrey sence needed so we decided to finish our storyboard and practice our camera shots and angle as well as fiim some extra bits for the film.

On Tuesday7 Wednesday I was absent so i was unavailable to film with the filming of the opening sequence

Friday, 14 January 2011

Monday, 10 January 2011

For tomorrow we have decided that were going to film everything on site
and we will be filming the interview scene and the montage of doors and maybe the scene of the police officer running.
For tomorrow we have decided that were going to film every thing on site
and we will be filming the interview scene and the montage of doors

Sunday, 9 January 2011

On Monday during our first filming of our opening sequence mantas will be unavailable to film with us because he has an exam on Monday. So because of this we have decided to film the montage of doors, the farther and baby and possible the police officer running as it does not require all the group members to be there.